Инженер по надзору за строительством
Описание
CURRICULUM VITAE
Name Igor L. Marchuk
Birth Date 30.11.1968 Mariupol, Donetsk region, Ukraine
Marital status Married
Tel. mob +380506589900, +380971913140
mail igmarmrp@mail.ru, igmarmrp7@gmail.com
Language ability English: a basic level, (Intermediate)
Education Dneprodzerzhinsk State Technical University, 2000 – 2006.
Welding technology and equipment.
Technology and equipment engineer.
Zhdanov Industrial College, 1984 – 1988.
Welding technology.
Welding specialist.
Additional education Quality Management System ISO 9001 – “TUV-Nord” training course.
Certified according to EN ISO 9712:2012,UT,(level II from 2017 to 2022).
International Welding Inspector (IWI-С), diploma according to ISO EN 3834.
Diploma issued by International Institute of Welding (IIW).
Work experience April 2020 – May 2021
JSC «Inspection Center Metinvest – Shipping»
Project: Final inspection and shipment of products (slab, plates, pipes, hot rolled coils, cold rolled
coils and galvanized coils) at the «Mariupol Ilyich Iron and Steel Works», Mariupol, Ukraine.
Position: QA/QC Senior technical inspector.
Duties:
Responsibilities include, but are not limited to:
( Checking the technical capacity of the plant to fulfill a specific order, preparing comments, suggestions
and recommendations;
- Organization and coordination of inspection activities at the plants according to inspection plan;
- Placement and organization of inspection personnel movement (if necessary) the positions, and the
demobilization of personnel freed;
( Monitoring of implementation of decisions;
( Monitoring technologies to established and agreed between the Customer and Plant Regulation;
( The input quality control of raw materials used for melting and casting of steel;
( Monitoring of process parameters for melting and casting of steel in the steelmaking shop;
( The visual quality control and control of geometric dimensions of products;
( Quality control of production of rolled around the work cycle in accordance with factory instructions and
technical specifications;
( monitoring the technological parameters of rolling (control amount determined by the inspection plan);
( The presence in the calibration for ultrasonic testing;
( Monitoring of ultrasound (automatic and manual), check the diagrams;
( Monitoring of heat treatment process;
( Monitoring sampling for mechanical tests and chemical analysis of samples branding inspector;
( Monitoring of the mechanical tests;
( Test protocols of mechanical and chemical tests;
( Monitoring of CFT (counterfloken treatment);
( Preparation of a database on the quality of metal for each prepared for shipment of a lot;
( Final acceptance of products (according to the procedures of inspection plan);
( Checking the quality of products loading into wagons;
( Making provisions for non-compliance as a products and impaired production technology;
- Review of finished product certificates;
( Issuing daily, weekly and final reports to the customer.
January 2020 – March 2020
ZAO «Intertek» ( “Moody International”)
Project: Inspection of the production of six – stage centrifugal pumps CNS500-1900-6 for Rumalia
Operating Organisation (Iran), at « NASOSENERGOMASH JSC», Sumy, Ukraine.
Position: QA/QC Senior technical supervision inspector.
Duties:
Responsibilities include, but are not limited to:
• Check the technical capabilities of the plant for the implementation of a specific order, the preparation
of comments, suggestions and recommendations;
• Monitoring the implementation of decisions;
• Control of production technologies according to the Regulations established and agreed between the
Customer and the plant;
• Input quality control of used raw materials and materials;
• Control of factory methods for the production ;
• Fit – up;
• Bench tests - mills tests;
• Check marking;
• Final acceptance of products (according to the procedures of the inspection plan);
• Verification and signing of certificates for finished products;
• Issuing Release Notices;
• Issuing daily, weekly and final reports to the customer.
August 2019 – December 2019
ZAO «Intertek» ( “Moody International”)
Project: Inspection of production of back up rolls from steel 50X5M1FA for “ArcelorMittal México SA de
CV”, at PJSC “Energomashspetsstal”, Kramatorsk, Ukraine.
Position: QA/QC Lead technical inspector.
Duties:
Responsibilities include, but are not limited to:
• Check the technical capabilities of the plant for the implementation of a specific order, the preparation
of comments, suggestions and recommendations;
• Monitoring the implementation of decisions;
• Control of production technologies according to the Regulations established and agreed between the
Customer and the plant;
• Input quality control of used raw materials and materials;
• Control of factory methods for the production of rolls;
• Analysis of all certificates of applied raw materials and materials;
• Monitoring of production;
• Control capillary method;
• Control of manual ultrasonic inspection;
• Control of surface roughness;
•. Visual inspection (absence of defects, cracks, deformation, finish, appearance, fullness);
• Dimensional control in accordance with the drawing;
• Check the catalog and technical passport, certificate of quality and workmanship in accordance with the
drawing;
• Verification of all technical documentation for the production of shafts;
• Check marking.
• Final acceptance of products (according to the procedures of the inspection plan);
• Verification and signing of certificates for finished products;
• Issuing Release Notices.;
• Sending daily, weekly and final reports to the customer.
January 2019 - July 2019
ZAO «Intertek» ( “Moody International”)
Project: Inspection of the production of tower vibroplillers made of stainless steel for Casale Project
(Czech Republic), at «Grace Engineering», Sumy, Ukraine.
Project: Inspection of the production of CPS Pumps CNS500-1900-6 for Rumalia Operating Organisation
(Iran), at « NASOSENERGOMASH JSC», Sumy, Ukraine.
Position: QA/QC Senior technical supervision inspector.
Duties:
Responsibilities include, but are not limited to:
• Check the technical capabilities of the plant for the implementation of a specific order, the preparation
of comments, suggestions and recommendations;
• Monitoring the implementation of decisions;
• Control of production technologies according to the Regulations established and agreed between the
Customer and the plant;
• Input quality control of used raw materials and materials;
• Control of factory methods for the production ;
• Supervision over sampling for mechanical tests and chemical analysis, stamping of samples by an
inspector;
• Supervision of mechanical testing;
• Verification of mechanical and chemical test reports;
• Bench tests;
• Control of production and quality of welding;
• Selective control of assembly and welding technology;
• Selective verification of surface roughness measurements.
• Check marking;
• Final acceptance of products (according to the procedures of the inspection plan);
• Verification and signing of certificates for finished products;
• Issuing Release Notices;
• Issuing daily, weekly and final reports to the customer.
June 2018 – December 2018
STF CC « Kontstand »
Project: Inspection of cryogenic flanged locking valves from stainless steel for «NAFTAN» Belarus by
«ARMAPROM» (Mirgorod) and «PROMARMATURA»(Dnepropetrovsk), Ukraine. Accordance with TU U 3.22
00218325-004-94, and requirements of technical regulations of the Customs Union TR CU 032/2013, TR CU
010/2011.
Project: Monitoring of pump-compressor pipes (tubing pipes) and couplings to them, for «RITEK» by
«Niko-Tube Interpipe», Nikopol. Ukraine. According to the Gost - 633-80.
Position: QA/QC Lead technical inspector.
Duties:
Responsibilities include, but are not limited to:
1. 100% - Inspection of smelting of valve bodies and covers
2. 100% - Inspection of machining of valve bodies and covers
3. 100% - Inspection of the assembly of valve bodies and covers
4. Lapping inspection of valve bodies and covers
5. 100% - Inspection of acceptance testing of parts, assemblies, assembled valves in accordance with TU U
3.22 00218325-004-94
6. 100% - Inspection of visual and measurement control
7. 100% - Fixing the number of quality and rejected valves with defects
8. Check the number of valves on the packing list.
9. Checking the markings on the valves.
10. Release of the shipment authorization
11. Issuance of daily, weekly and final reports
Organization and coordination of inspection activities at the plants according to inspection plan;
Distribution and shifting inspection personnel (if required) to positions as well as demobilization of free
personnel;
Preparing inspection reports (daily or weekly) to Customer according to distribution list;
Analysis of all certificates for applied raw and other materials;
Monitoring work status;
Inspection of automatic and manual NDT;
Review of certificates for pipe billets;
Monitoring of pipe production process during all its stages;
Witnessing sampling for chemical analysis and for mechanical tests;
Inspection of mechanical tests and review of Mechanical Test Reports;
Inspection of threading and visual inspection of thread quality;
Inspection of coupling manufacturing;
Inspection of hydro tests;
Inspection of pipe geometry parameters;
Inspection of coupling make-up and correct position;
Inspection of preservation coating application;
Inspection of packing and storage conditions for pipes and other materials in warehouse;
Inspection of documents completeness;
Inspection of load-out;
Review of finished product certificates and signing them;
Issuing Release Notices.
April 2018 – May 2018
ZAO «Intertek» ( “Moody International”)
Projects: Quality surveillance production of steel sheets API 5L L415M/X60M PSL2 for «ENPPI» ( Egypt)
NOOROS El-Gamil Pipeline Project, on PJSC «Azovstal Iron & Steel Works» Mariupol,Doneck region, Ukraine.
Position: Technical surveyor
Duties:
( Checking the technical capacity of the plant to fulfill a specific order, preparing comments, suggestions
and recommendations;
( Monitoring of implementation of decisions;
( Monitoring technologies to established and agreed between the Customer and Plant Regulation;
( The input quality control of raw materials used for melting and casting of steel;
( Monitoring of process parameters for melting and casting of steel in the steelmaking shop;
( The visual quality control of slabs;
( Quality control of production of rolled around the work cycle in accordance with factory instructions and
technical specifications;
( monitoring the technological parameters of rolling (control amount determined by the inspection plan);
( Selective visual quality control of sheet metal;
( The presence in the calibration for ultrasonic testing;
( Monitoring of ultrasound (automatic and manual), check the diagrams;
( Monitoring of heat treatment process;
( Monitoring sampling for mechanical tests and chemical analysis of samples branding inspector;
( Monitoring of the mechanical tests;
( Test protocols of mechanical and chemical tests;
( Monitoring of CFT (counterfloken treatment);
( Preparation of a database on the quality of metal for each prepared for shipment of a lot;
( Final acceptance of products (according to the procedures of inspection plan);
( Checking the quality certificate shipped in sheets and inspection (the inspector's signature and seal on
each certificate);
( Checking the quality of strips loading into wagons;
( Making provisions for non-compliance as a sheet and impaired production technology;
(Issuing Release Notices.
( Issuing daily, weekly and final reports to the customer.
February 2018 – March 2018
ZAO «Intertek» ( “Moody International”)
Projects: Expediting production of steel sheets API 5L L415M/X60M PSL2 for «ENPPI» ( Egypt) NOOROS
El-Gamil Pipeline Project, on PJSC «Azovstal Iron & Steel Works» Mariupol,Doneck region, Ukraine.
Position: Technical surveyor.
Duties:
( Checking the technical capacity of the plant to fulfill a specific order, preparing comments, suggestions
and recommendations;
( Monitoring technologies to established and agreed between the Customer and Plant Regulation;
( Monitoring of production;
( Monitoring саstslabs;
( The visual quality control of slabs;
( Selective visual quality control of sheet metal;
( Monitoring rolled sheets;
( Monitoring of automatic and manual NDT
( Monitoring of the mechanical tests;
( Test protocols of mechanical and chemical tests;
( Checking the quality certificate shipped in sheets;
( Checking the quality of strips loading into wagons;
( Predicting risk of failure of delivery;
( Preparation of daily, weekly and final reports
January 2017– December 2017
LLC «TechnoService»
Projects: Monitoring of seamless hot-rolled pipes and couplings to them on the LUKOIL-Western Siberia
project. « Nizhnedneprovsky Pipe Plant, Interpipe», Dnepropetrovsk. Ukraine . According to Gost -
8731/8732, + additional technical requirements of LUKOIL.
Project: Monitoring of casing pipes and couplings to them on the project LUKOIL-Western Siberia.
«Nizhnedneprovsky Pipe Plant, Interpipe», Dnepropetrovsk. Ukraine. According to the Gost - 632-80 and
API-5L, + add. tech. req.of LUKOIL.
Project: Monitoring of pump-compressor pipes(tubing pipes) and couplings to them on the LUKOIL-Western
Siberia project. «Niko-Tube Interpipe», Nikopol. Ukraine. According to the Gost - 633-80, + add. tech.
req.of LUKOIL.
Project: Monitoring of seamless steel hot-rolled pipes and couplings to them on the project LUKOIL-Western
Siberia. «Niko-Tube Interpipe», Nikopol. Ukraine . According to the Gost - 8731/8732, + add. tech. req.of
LUKOIL.
Project: Monitoring of pump-compressor pipes (tubing pipes) and couplings to them on the RITEK. «Niko-Tube
Interpipe», Nikopol. Ukraine. According to the Gost - 633-80.
Position: QA/QC Lead inspector.
Duties:
Responsibilities include, but are not limited to:
Organization and coordination of inspection activities at the plants according to inspection plan;
Distribution and shifting inspection personnel (if required) to positions as well as demobilization of free
personnel;
Preparing inspection reports (daily or weekly) to Customer according to distribution list;
Analysis of all certificates for applied raw and other materials;
Monitoring work status;
Inspection of automatic and manual NDT;
Review of certificates for pipe billets;
Monitoring of pipe production process during all its stages;
Witnessing sampling for chemical analysis and for mechanical tests;
Inspection of mechanical tests and review of Mechanical Test Reports;
Inspection of threading and visual inspection of thread quality;
Inspection of coupling manufacturing;
Inspection of hydro tests;
Inspection of pipe geometry parameters;
Inspection of coupling make-up and correct position;
Inspection of preservation coating application;
Inspection of packing and storage conditions for pipes and other materials in warehouse;
Inspection of documents completeness;
Inspection of load-out;
Review of finished product certificates and signing them;
Issuing Release Notices.
September 2016 – December 2016
LLC «IDRA IQI GROUP»
Projects: Technical supervision of the manufacture of Slag pot car 16 m3 to " Isfahan Steel company "
Iran on the " MAGMA LLC " Ukraine, Mariupol Donetsk region, according TC-2259.00.000.1.
Position: Senior technical supervision inspector.
Duties:
Responsibilities include, but are not limited to:
Visual check (absence of defects, imperfections, deformation, finishing, appearance, completeness, colour
coating, tag number, etc.).
2. Construction supervision of assembly;
Technical specification, type of the goods and marking must be according to final PI.
Dimensional check must be performed by measurement according to attached Drawing.
Catalogue and technical passport, Quality certificate and manufacturing and assembly drawings of the goods
must be provided.
All technical documents must be checked and controlled..
Check the shipping marking and labelling respectively itemizing as per requirement and standard (if any).
Check the quantity (tally and net/gross weight) of goods to be shipped.
Packing must be checked, it must be protected with oil stripe and placed on the pallet and meet the
requirement of PI and suitable for transportation.
Full details of goods including good’s description, code (Esfahan Steel item code) and order no. should be
provided in label and attached to the both side of pallets.
Inspection of NDT;
Review & Verification of final documentation.
Check country of origin.
Take photos of all inspection activities.
Supervision of production and quality of welding;
Random inspections blasting technology;
17. Selective inspection of surface roughness measurements.
Prepare inspection report and submit it along the photos to the office
November 2015 – August 2016
ZAO «Intertek» ( “Moody International”)
Projects: Technical supervision of the manufacture of metal construction on the project "Lodz" to
"Mostostal" Poland on the " Zhytomyr Metal Constructions Plant " Ukraine, Zhytomyr region, according
EN-1090-2.
Position: QA/QC Lead inspector.
Duties:
Responsibilities include, but are not limited to:
• verification of the technical capabilities to fulfill the specific order of the plant, preparation of
comments, suggestions and recommendations;
• verification of the quality plan provider for quality assurance;
• check the availability of certified quality control laboratory of welding;
• inspection of incoming inspection of materials and coatings;
• verification of the certificates of all the materials used;
• verification of the reports of the input control of materials;
• verification of certification of welders;
• verification WPS and WPQR for the production of welding;
• supervision of the quality documentation prepared in the course of production, confirmed in writing.
• presence in the calibration of ultrasonic testing;
• presence in the x-ray inspection;
• check for the presence of impermeability;
• construction supervision of assembly;
• supervision of production and quality of welding;
• random inspections blasting technology;
• selective inspection of surface roughness measurements;
• verification of the results of measurements of surface roughness;
• verification protocol test coating thickness;
• monitoring the application of paint on the construction;
• verification protocol test coverage;
• verification certificates and certificates of calibration and verification of measuring equipment used by
the provider;
• verification of final documentation;
• issuance permits of shipping(IRN);
• selective inspections of shipping operations.
• Preparation of daily, weekly reports and the final report.
February 2015 – October 2015
ZAO «Intertek» ( “Moody International”)
Projects: Inspection of spiral welded pipes with a coating 3LPE for gas and oil pipelines on the pipeline
project "Trans Anatolian Natural Gas Pipeline Project(TANAP)" at JSC « Emek Boru» Ankara, «NOKSEL Steel
Pipe» Hendek/Sakarya, «Umran Celik Boru» Akçakoca-Düzce,«Tosçelık» Osmaniye, «Ercıyas»Düzce. Turkey.X70M
API 5L PSL2.
Position: QA/QC Lead inspector.
Duties:
Responsibilities include, but are not limited to:
• Organization and coordination of inspections at the plant in accordance with the inspection plan;
• placement and organization of inspection personnel movement (if necessary) the positions, and the
demobilization of personnel freed;
• verification of the quality plan provider for quality assurance;
• inspection of incoming inspection of coating materials;
• verification of the certificates of all the materials used;
• inspections protective coating;
• checking reports incoming inspection of pipes;
• inspections of preparation of steel pipes;
• inspections drying technology and heating pipes;
• inspection technology for blasting the surface of the tubes and inspection of preservation coating
application;
• inspection reports of quality control cleaning pipe surfaces prior to the application of anti-corrosion
coatings;
• inspections of testing the quality of the coating;
• check the quality of test coverage;
• inspections of measuring surface roughness;
• verification of the results of measurements of surface roughness;
• verification protocol test coating thickness;
• verification of the qualification and certification of all personnel engaged in welding operations;
• check if a certified laboratory quality control of welding;
• visual inspection of pipes;
• inspection of automatic and manual NDT;
• inspections of pipe marking;
• verification protocol test coverage;
• preparation of reports on the work of inspection (daily or weekly) to the customer;
• verification of certificates and verification of the measurement and calibration equipment used by the
provider;
• verification of final documentation;
• issuing Release Notices;
• inspections of shipping operations.
April 2014 – December 2014
ZAO «Intertek» ( “Moody International”)
Projects: Expediting production of steel sheets Х65 PSL2 for «Edgen Murray Pte Ltd (Singapore) NAM CON
SON 2 Gas Pipeline Project, on PJSC «Azovstal Iron & Steel Works» Mariupol,Doneck region, Ukraine.
Position: Technical surveyor.
Duties:
( Checking the technical capacity of the plant to fulfill a specific order, preparing comments, suggestions
and recommendations;
( Monitoring technologies to established and agreed between the Customer and Plant Regulation;
( Monitoring of production;
( Monitoring саstslabs;
( The visual quality control of slabs;
( Selective visual quality control of sheet metal;
( Monitoring rolled sheets;
( Monitoring of the mechanical tests;
( Test protocols of mechanical and chemical tests;
( Checking the quality certificate shipped in sheets;
( Checking the quality of strips loading into wagons;
( Predicting risk of failure of delivery;
( Preparation of daily, weekly and final reports.
June 2011 - January 2014
ZAO “TechnoExpertService”
Projects: Inspection production of steel sheets for "Vyksa Pipe Plant", on "AMP" Alchevsk, Ukraine.
Position: Technical inspector rolled sheet.
Duties:
( Checking the technical capacity of the plant to fulfill a specific order, preparing comments, suggestions
and recommendations;
( Monitoring of implementation of decisions;
( Monitoring technologies to established and agreed between the Customer and Plant Regulation;
( The input quality control of raw materials used for melting and casting of steel;
( Monitoring of process parameters for melting and casting of steel in the steelmaking shop;
( The visual quality control of slabs;
( Quality control of production of rolled around the work cycle in accordance with factory instructions and
technical specifications;
( monitoring the technological parameters of rolling (control amount determined by the inspection plan);
( Selective visual quality control of sheet metal;
( The presence in the calibration for ultrasonic testing;
( Monitoring of ultrasound (automatic and manual), check the diagrams;
( Monitoring of heat treatment process;
( Monitoring sampling for mechanical tests and chemical analysis of samples branding inspector;
( Monitoring of the mechanical tests;
( Test protocols of mechanical and chemical tests;
( Monitoring of CFT (counterflokenaya treatment);
( Preparation of a database on the quality of metal for each prepared for shipment of a lot;
( Final acceptance of products (according to the procedures of inspection plan);
( Checking the quality certificate shipped in sheets and inspection (the inspector's signature and seal on
each certificate);
( Checking the quality of strips loading into wagons;
( Making provisions for non-compliance as a sheet and impaired production technology;
( Preparation of daily reports.
January 2011 - May 2011
ZAO “KaTK”
Projects: Inspection of spiral welded pipes with a coating for gas and oil pipelines on the pipeline
project "Almaty-Bayserke-Talgar" at JSC «Arcelor Mittal Tubular Products» Aktau,
Kazakhstan.GOST-20295-85,GOST-52568-06
Position: Customer representative.
Duties:
( Organization and coordination of the inspectors at the plant in accordance with the PPI;
( Distribution and movement of personnel inspection (if necessary) in the post, and Demobilization;
( Preparation of inspection reports (daily, weekly, final report;
( An analysis of all certificates applied kinds of raw materials;
( Monitoring work status;
( Monitoring the welding process;
( Control of automatic and manual ultrasonic testing;
( Monitoring radiography;
( Check the
3 ноября, 2016
Александр
Город
Симферополь
Возраст
37 лет ( 7 мая 1987)
15 декабря, 2017
Павел
Город
Симферополь
Возраст
52 года (21 октября 1972)
7 ноября, 2016
Михаил
Город
Симферополь
Возраст
51 год (11 июня 1973)